Nashville's Roofers — Middle Tennessee (615) 703-3193 Free Estimate
Home Roof Repair Roof Replacement Storm & Hail Damage Insurance Claim Help Gutters & Flashing Commercial & Flat Roofing Service Area From the Top About Get a Free Estimate

Roofing · Nashville, TN

Comparing Roofing Estimates in Nashville, Line by Line

The gap between two roofing estimates is usually a list of things one roofer wrote down and the other did not. Here are the lines to line up side by side, and what the code says about each.

We respond immediately Licensed and insured local crews Free, no-obligation estimates

· by Michael Blair, Nashville's Roofers

Getting two or three estimates for a new roof is good practice, and it is common for them to land far apart for the same house. Usually the cheaper one is not a better deal on the same roof; it is a shorter list. One roofer wrote down the tear-off, the underlayment, the drip edge and the nailing, and the other left some of it to be assumed.

This is how to put two estimates side by side and see whether they describe the same job, using the residential code Metro Nashville adopted in 2025 and the shingle maker’s own instructions. It is how we write the estimates for our roof replacement service, so you can hold ours to the same list.

Why are two estimates for the same roof so far apart?

Because they rarely describe the same work. Each roofer decides what goes on the page, and an item left off the page may or may not be in the price. The way to compare is to make a list of the lines below and mark, for each estimate, whether it names the item, says what it is, and says whether it is included.

Which code the roof is built to depends on where the house is. Metro Codes’ adopted codes list shows the 2024 International Residential Code in force in Davidson County, adopted under BL2025-898 and effective July 16, 2025 for applications submitted on or after that date. The State Fire Marshal’s list of adopted codes still shows the 2018 International Residential Code at the state level. Franklin and the other cities outside Metro can confirm their own edition; for a house in Williamson County, see our page on roofing in Franklin.

What should the tear-off and underlayment lines say?

That the old roof comes off down to the deck, and what goes on the deck before the shingles. The Nashville and Davidson County residential code, Chapter 9, says plainly in R908.3 that a roof replacement includes removing the existing layers of roof covering down to the roof deck. An estimate that does not say tear-off, and how many layers, leaves the question open. Our post on roofing over old shingles or tearing off covers why that matters.

Once the deck is bare, any rotten boards show up, which is why a good estimate prices replacement decking per sheet instead of ignoring it; our post on why your roof estimate includes decking walks through that line. Then the underlayment. GAF’s Timberline installation instructions note that underlayment is required by many code bodies and is needed to keep the shingles’ UL Class A fire rating. The estimate should name the product, not just say underlayment.

Does the code require drip edge on a shingle roof?

Yes, at both the eaves and the rakes. Section R905.2.8.5 of the Davidson County code requires drip edge on shingle roofs, with the pieces overlapped at least 2 inches, extending at least a quarter inch below the sheathing and at least 2 inches back onto the deck, and fastened no more than 12 inches apart. The underlayment goes over the drip edge at the eaves and under it at the rakes, which matches the order GAF’s instructions give.

Drip edge is also easy to check after the job, because you can see it from the ground. If one estimate lists it and the other does not, ask the second roofer whether it is included before you compare prices.

What fastening and flashing details belong on the estimate?

The nails per shingle, the nail type, and whether the flashing is new metal. R905.2.6 requires at least four fasteners per strip shingle, or the manufacturer’s minimum if higher, and R905.2.5 calls for corrosion-resistant roofing nails with at least a 12-gage shank and a 3/8-inch head, driven at least 3/4 inch into the sheathing or through it. GAF’s standard pattern is four nails per shingle; its enhanced pattern uses six, which the instructions say some local codes require and some products need for enhanced wind coverage. GAF also says nails go in flush, because an overdriven nail damages the shingle.

Flashing at walls and chimneys should be listed as replaced, not reused, and R905.2.8.1 sets corrosion-resistant metal at least 0.019 inch thick for base and cap flashing. Ice barrier at the eaves is required only where the local design table records a history of ice forming along the eaves, so ask whether your jurisdiction calls for it before treating it as an extra. When you are ready for an estimate written to this list, ask us for a free roof estimate.

Sources

FAQ

Comparing Roofing Estimates in Nashville, Line by Line — questions

What should a roofing estimate include?

At a minimum: tear-off to the deck and the number of layers, how damaged decking is priced, the underlayment by name, drip edge at eaves and rakes, the nails per shingle, new metal flashing at walls and chimneys, and the shingle line. If an item is missing, ask whether it is included before comparing prices.

How do you compare roofing estimates?

Put them side by side and make one list of items: tear-off, decking, underlayment, drip edge, nailing, flashing, ventilation and the shingle. Mark whether each estimate names the item and includes it. Compare prices only after the lists match, because a lower total often means a shorter list rather than a cheaper roof.

Is a roofing estimate free?

Ours is. We look at the roof, measure it and write the estimate item by item so it can be compared with any other. Expect a written estimate to name the tear-off, underlayment, drip edge, nailing and flashing, and ask any roofer whose estimate leaves those out what is included.

How many nails per shingle should a new roof have?

Davidson County’s residential code requires at least four fasteners per strip shingle, or the manufacturer’s minimum if it is higher. GAF’s standard pattern is four; its enhanced pattern uses six, which some local codes require and some products need for enhanced wind coverage. The estimate should state which pattern will be used.

Is underlayment required under shingles?

GAF’s Timberline instructions say underlayment is required by many code bodies and is needed to keep the shingles’ UL Class A fire rating. A roofing estimate should name the underlayment product it uses, and at the eaves it goes over the drip edge while at the rakes it goes under it.

Free estimate

Roof leaking or storm-damaged? Get a roofer up there

Tell Nashville's Roofers what the roof or the ceiling is showing, and a roofer’s written estimate follows at no cost, with no obligation to sign.

Call Chat Free Estimate
Roof leak or storm damage?